POWER
CHP PLANT : BLACKBURN
BACK
<
>
Client : Alstom Power
Project: CHP Plant Blackburn
Project Value: £4.2m
CHP Plant Blackburn
The construction of a steel framed and clad ‘Water Treatment Building’ complete with fully fitted offices, kitchens, workshops, process plant areas and a mezzanine laboratory.
The construction of a steel framed and clad ‘Electrical Control Building’ complete with office, Battery room and both Lv and Hv control rooms on a suspended ‘computer floor’
The design and installation of a sit wide fire main and deluge system. The design and installation of HVAC, electrics and lighting to the buildings. Construction and installation of all reinforced concrete foundations to a Gas Turbine which has its main block suspended on a spring system independently within the foundations. Construction and installation of all reinforced concrete foundations to the heat recovery steam generator [HRSG], pipe track foundations, water tanks and water cooling tower.
Mainframe support steelwork, walkways, platforms and stairways to various structures.
The design and installation of a site wide earthling system.
All drainage systems, including a highly complex hung drainage system suspended from piles, together with all multi duct banks, penstocks and manholes across the site. Site perimeter fencing and all concrete internal roads and hard standings.